Legislation

Which floors need radon measurement in a workplace?

Published on ·Radón Canarias
Which floors need radon measurement in a workplace?

The question we are asked most often

When a workplace asks us for a quote, the first question is almost never how many detectors are needed. It is a different, more basic one: which floors have to be measured? The drawing says "ground floor", but the premises are half a metre above the pavement. Or the building stands on a hillside and the floor you enter at street level from the front is the third floor from the back. Or there is a semi-basement and nobody knows whether it counts as a basement.

The answer lies in two texts: Royal Decree 1029/2022, which establishes the obligation, and Instruction IS-47 from the Nuclear Safety Council (CSN), which defines the terms. In this article we quote them word for word, point out where the legal text ends and where our own criterion begins, and summarise it all in five diagrams.

What Royal Decree 1029/2022 says

The obligation to measure in workplaces comes from Article 75.1 of the Regulation on health protection against risks from exposure to ionising radiation. This is the text (original Spanish):

"Los titulares de las actividades laborales que se desarrollen en los lugares de trabajo citados a continuación, deberán estimar el promedio anual de concentración de radón en aire en todas las zonas del lugar de trabajo en las que los trabajadores deban permanecer o a las que puedan acceder por razón de su trabajo, excluidas las zonas al aire libre: [...] c) todos los lugares de trabajo situados en planta bajo rasante o planta baja de los términos municipales de actuación prioritaria a los que hace referencia el artículo 79."

In short: the employers of the workplaces listed must estimate the annual average radon concentration in every area of the workplace where staff are required to be or may enter for reasons of their work, excluding open-air areas; point (c) of that list covers every workplace located on a below-grade floor (planta bajo rasante) or on the ground floor (planta baja) in the priority action municipalities referred to in Article 79.

Three things follow from this passage. The first is that the criterion is one of floor level: the ground floor and below-grade floors. The second is that, within those floors, every area where staff are required to be or may enter must be covered, except those in the open air. The third is that this point (c) applies only to the priority action municipalities.

Those municipalities are set by Article 3 of IS-47, which refers to the classification in the Technical Building Code (CTE): they are the municipalities included as Zone II in Appendix B of Section HS 6. In the Canary Islands that means almost every municipality in Tenerife and Gran Canaria. The municipality of each workplace can be checked on our regulatory radon map.

Points (a) and (b) of the same Article 75.1 also require measurement in underground workplaces and in those where water of underground origin is processed, handled or used, whichever municipality they are in. But the usual case of an office, a shop or a warehouse is point (c), and that is what this article is about.

"Ground floor" is a level, not a name

Here is the key to everything. IS-47 does not leave the expression "ground floor" open to each person's interpretation. It defines it in Article 2:

"Ground floor: The floor of a building where the vertical distance between grade level and the upper face of the floor slab does not exceed 1 m."

In other words, the ground floor is the storey whose floor is, at most, 1 m above grade level. The limit is inclusive: a floor that sits at exactly 1.00 m is still ground floor, because the instruction says "does not exceed". It does not matter what the design, the cadastre or the building licence call it. What matters is the vertical distance between grade level and the upper face of the floor slab.

The instruction, on the other hand, defines neither "below-grade floor" (planta bajo rasante) nor "grade level" (rasante), although it uses both expressions: the first, for example, in Article 4, when it requires that the sampling zones be determined "in the interior spaces of the ground floor and below-grade floors of the workplace". So we have to turn to the ordinary meaning of the words, and that is already our own reading: grade level is the ground or the pavement in contact with the building, and below-grade floors are basements and semi-basements, the storeys whose floor lies below it.

Putting the two pieces together gives a very simple practical rule: every storey whose floor is 1 m or less above grade level is measured, and so is everything below it.

The one-metre rule: which floors have to be measured
Workplace in a Zone II municipality · RD 1029/2022, art. 75.1.c · IS-⁠47, Article 2
Measured
work area with more than 50 h/year of occupancy
Not measured
outside the scope of art. 75.1.c
grade level (pavement or ground)
+1.00 m: "ground floor" limit under IS-⁠47
0.60 m
1.00 m
First floor
floor at +3.60 m
Not measured
Ground floor
floor at +0.60 m (1 m or less above grade)
Measured
Basement
below-grade floor
Measured

The label on the drawing does not decide

A frequent mistake is to take the "ground floor" label on the drawings as if it were the IS-47 definition. It is not. Each local council defines the ground floor in its planning regulations with its own margin, designed for measuring heights and buildable floor area, not for radon. Three Canarian examples published in the Official Gazette of the Canary Islands (BOC) show this.

The 1992 Subsidiary Planning Rules (Normas Subsidiarias) of San Sebastián de La Gomera (a municipality that is not Zone II, but the example serves to show how the term is defined) define it as follows:

"It is the floor whose flooring is situated between 0.60 metres below the street grade level at the point where the height is measured and: a) 1.20 metres above it, if there is housing on the ground floor. b) 0.60 metres above grade level in all other cases."

The 2018 Municipal Building Ordinance of Las Palmas de Gran Canaria ties it to the building's reference level, which may be up to 1.40 m above grade level:

"Ground floor: the ground floor is understood to be the floor where more than fifty per cent (50%) of its area has its floor coinciding with the building's reference level"

And the 1992 Urban Planning Rules of the General Plan of Santa Cruz de Tenerife allow up to 150 cm above the pavement:

"The height of the building shall be measured from the reference level of the ground floor, which may not be situated at a height greater than one hundred and fifty (150) centimetres above the pavement grade level at the midpoint of the façade."

With margins of 0.60 m, 1.20 m, 1.40 m or 1.50 m depending on the municipality, premises can be "ground floor" for planning purposes and not for IS-47, which draws the line at 1 m. That is why the actual level has to be checked instead of trusting the label. There are two cases in which that check changes the result, and one qualification about the second.

Ground floor raised more than 1 m

This is common in buildings whose entrance hall is raised above a semi-basement or a garage. If the floor of the "ground floor" is more than 1 m above grade level, for IS-47 it is not ground floor. And, since it is not below grade either, it falls outside point (c) of Article 75.1. This holds for a level plot: if the rear of that same floor is buried, it comes within scope for the reason we explain in the next section. What does always come within scope is the semi-basement beneath it, if staff spend more than 50 hours a year in it.

Drawing labels do not decide: the level does
Two premises labelled "ground floor". Only one counts as such for IS-⁠47 (floor no more than 1 m above grade level)
Measured
ground floor or below grade
Not measured
outside the scope of art. 75.1.c
grade level
1 m limit of IS-⁠47
A · Ground floor at grade
+1.00 m
0.50 m
First floor
Not measured
Ground floor
floor at +0.50 m
Measured
Basement
below grade
Measured
B · Raised ground floor
+1.00 m
1.60 m
First floor
Not measured
"Ground floor" per drawing
floor at +1.60 m: over one metre
neither ground floor nor below grade: outside art. 75.1.c
Not measured
Not ground floor (IS-⁠47)
Semi-basement
floor at −1.40 m: below grade
Measured
Each council defines "ground floor" with its own margin (some planning rules allow up to 1.20 m, 1.40 m or 1.50 m above grade level). For radon measurement only the IS-⁠47 definition counts: the vertical distance between grade level and the upper face of the floor slab.

Sloping ground and buildings built against the rock

This is the quintessential Canarian case. On a hillside, a floor labelled "first" or "second" can have its front façade open to the air, above the street, and be buried at the back against the rock: that is what the diagram shows. And if the street is at the top and the building steps down the hillside, the same happens in reverse: the floors that lie below street level are below grade on the front façade, even though the rear façade opens onto the ravine. In both cases that floor is in contact with the ground exactly like a basement, and radon enters through that wall just as it would through a ground-bearing slab.

Our criterion is to take any façade in contact with the ground as the reference: storeys whose floor lies below ground level at that façade, or 1 m or less above it, come within scope. And within those floors, the rooms built against the rock form their own sampling zone and get their own detector.

Sloping ground: "upper" floors that are buried at the back
The street is in front; the rock rises behind. Every floor whose floor lies below the rock, or 1 m or less above it, is in scope
Measured
work area with more than 50 h/year of occupancy
Not measured
outside the scope of art. 75.1.c
Street grade level
Ground level at the rear façade (+7.0 m)
+1 m above the rock
at least one detector per zone
room against the rock: separate zone (our criterion)
+7.0 m
0.6 m
1.4 m
Rock / hillside
Third floor
floor 2.4 m above the rock
Not measured
Second floor
floor 0.6 m below the rock
Measured
First floor
buried at the back
Measured
Ground floor
at street level
Measured
Prudent criterion, not legal text: IS-⁠47 defines the ground floor by its level above grade, but does not settle which grade level applies when the façades are at different heights. Taking any façade in contact with the ground as the reference is the safe reading. Record where the level comes from.

The separate zone is our own criterion, but not a whim: we base it on how IS-47 defines the unit of measurement, in the same Article 2:

"Sampling zone: An area of a building or facility whose characteristics relating to the entry and propagation of radon (type of walls, foundations, floor and subsoil, ventilation regime, temperature…) make the concentration of this gas throughout its volume homogeneous or very slightly variable."

A room with a wall against the rock has radon entry characteristics that differ from those of the room next door, which faces the street. In our view, they cannot form a single homogeneous zone. And since Article 4 of the instruction requires at least one detector to be installed in each sampling zone, the room built against the rock gets its own.

When the wall does not touch the ground

There are two situations in which a room that seems to be "built against the rock" is not. The first is the ventilated air cavity: if, between the rock and the wall of the premises, there is a cavity that collects the air from the ground and discharges it outside, the premises are not in direct contact with the ground. This is our own criterion, but it follows the same logic the Technical Building Code uses to define one of its protection solutions:

"Ventilated containment space: A space situated between the ground and the premises to be protected which receives the radon coming from the ground and which, by means of natural or mechanical ventilation, expels it to the outside of the building."

The second is the party wall. If the wall adjoins the neighbouring building, it is not touching earth or rock; in our view, a party wall is not contact with the ground.

Walls not touching the ground: ventilated cavity and party wall
Two cases where a room "against the rock" does not touch the ground. They affect how zones are delimited, not whether the floor is measured
A
Ventilated air cavity
Work premises
measured if ground floor or below grade
ventilated cavity
grille
Rock
A ventilated air cavity lies between the rock and the wall: the premises do not touch the ground. It is the logic of the CTE DB HS 6 "ventilated containment space": it receives the radon coming from the ground and expels it outside.
B
Party wall
Work premises
building A
party wall
Adjacent building
building B
The wall adjoins another building, not the ground: a party wall is not contact with the ground. What counts is what the wall touches: earth or rock, yes; another building or a ventilated cavity, no.

It is important not to confuse the scope of this nuance. The ventilated cavity and the party wall affect how the sampling zones are delimited, not whether the floor is measured. If the floor is ground floor or below grade by its level, it is measured all the same.

The 50-hour exception

Within the floors that come within scope, not every area is measured. Article 4 of IS-47, in point (d), makes it clear:

"Transit zones or zones of sporadic occupancy shall be exempt from measurement; that is, those in which workers are present for no more than 50 hours per year."

A meter room, an archive room that one person enters for half an hour twice a month, or a corridor do not need a detector. A storeroom where someone works a couple of hours a week does: that exceeds 50 hours a year.

When in doubt, measure

So far we have covered what the regulations say and what follows from them; the points where we have applied our own criterion (what counts as below grade, the separate zone for rooms against the rock, the ventilated cavity and the party wall) have been marked as such. The most important one remains, on which IS-47 is silent, and what follows is solely our own criterion. We say so clearly so that nobody mistakes it for a legal requirement.

!

IS-47 defines the ground floor by its level above grade, but it does not settle which grade level applies when a building's façades are at different heights. Taking any façade in contact with the ground as the reference is a prudent criterion, not legal text. If the floor of a storey is 1 m or less above grade level, or below it, at any of its façades in contact with the ground, we measure it.

The doubt we are referring to is only that one: the level when the façades are not at the same height. For everything else there is no doubt to resolve, and the outcome may well be that no measurement is needed: a ground floor raised more than 1 m on a level plot is not measured, nor is a first floor with no contact with the ground, and an area where staff do not reach 50 hours a year does not get a detector. In the doubtful case, the reason to measure is twofold. On the one hand, the aim of the regulation is to estimate the actual exposure of workers, and radon does not know what number the floor has been given on the drawing. On the other, measuring too much costs one detector; measuring too little leaves a real exposure unestimated, which is exactly what the regulation seeks to avoid.

And a practical tip that saves arguments: it is worth recording where the level comes from. A dimensioned section drawing, a topographic survey or an in situ measurement with a level. If one day you have to justify why one floor was measured and another was not, that record is what settles it.

Must this floor be measured? The three questions
Operational summary for workplaces in Zone II municipalities
  1. Is the workplace in a Zone II municipality?
    priority action municipalities: IS-⁠47, Article 3
    No
    Only in scope if it is underground or handles water of underground origin
    art. 75.1, points a and b
    Yes
  2. Is the floor of the storey 1 m or less above grade level, or below it, at any façade in contact with the ground?
    No
    Outside the scope of art. 75.1.c
    Note the level and the drawing or survey it is from.
    Not measured
    Yes
  3. The floor is in scope. Within it, are there areas where staff are present for more than 50 hours a year?
    IS-⁠47, Article 4, point d
    No
    Floor exempt from measurement
    all its areas are transit or sporadic-occupancy areas
    Not measured
    Yes
Delimit the sampling zones (IS-⁠47, Article 4, point a) with at least one detector per zone.
Rooms against the rock form their own zone (our criterion).
Measured
If in doubt about the level, measure.
And record where it comes from.
IS-⁠47 defines "ground floor" (floor no more than 1 m above grade level) but defines neither "below-grade floor" nor "grade level". An open mezzanine is not a floor: it goes with the floor that contains it. Taking any façade in contact with the ground as the reference is a prudent criterion of Radón Canarias, not legal text.

In summary

In Zone II municipalities, every work area located on the ground floor and on below-grade floors is measured, except those where staff presence does not exceed 50 hours a year. Under IS-47, the ground floor is the storey whose floor is no more than 1 m vertically from grade level: it is a level, not a name. And below grade, in our reading, means basements and semi-basements, the storeys whose floor lies below the ground or the pavement that touches the building.

That is why the label on the drawing does not decide. A ground floor raised more than 1 m is not a ground floor for IS-47, while a "first" floor buried at the back does come within scope. Under our criterion, in a building built against the rock the rooms in contact with it form their own sampling zone and get their own detector, unless there is a ventilated cavity or the wall is a party wall, in which case we take it that there is no contact with the ground. And when in doubt about the level, measure, and record where it comes from.

To find out how many detectors are needed once the floors have been identified, our detector calculator for workplaces applies the table in Article 4 of IS-47. And if the doubt is about a mezzanine or a loft level, which for these purposes are not a floor, we deal with it in Do you need to measure radon on mezzanines?.


Regulatory references:

Royal Decree 1029/2022: Regulation on health protection against the risks arising from exposure to ionising radiation (Articles 75 and 79)

CSN Instruction IS-47: Instruction IS-47 of 9 April 2025, approving the list of priority action municipalities against radon and setting out guidelines for radon measurements in indoor air at workplaces located in them (Articles 2, 3 and 4)

Technical Building Code, Section HS 6: Protection against exposure to radon (Appendix A, terminology, and Appendix B, classification of municipalities)

BOC No. 76, 11 June 1992: Planning regulations of the Subsidiary Planning Rules of San Sebastián de La Gomera (Article 33, ground floor)

BOC No. 75, 18 April 2018: Municipal Building Ordinance of Las Palmas de Gran Canaria

BOC No. 42, 1 April 1992: Planning regulations of the General Development Plan of Santa Cruz de Tenerife (Article 11.5.9, origin and reference level)

Related articles